Dear all,
I want to use Ewald summation with SPC/E model but I do not know how to apply the following settings:
“Ewald summations were used in our simulations with the parameter for κ = 2.0 1/Å and the real-space cut distance rcut and Kmax chosen as 10.0 Å and 7, respectively.”
http://dx.doi.org/10.5012/bkcs.2013.34.12.3800
I’d appreciate if anyone could help.
Regards
MN
Sent with Mailtrack