I have bi_axial loading with same rate (0.01); 3% in y direction & 17% in x direction. my time step is 0.001, so I need to do run command 3000 time steps for y & 17000 time steps. How can I apply run command that is started loading in 2 direction simultaneously, after 3000 time steps loading on y is stopped and loading on x is continued the remaining 14000 time steps?
Hi!
I have bi_axial loading with same rate (0.01); 3% in y direction & 17% in
x direction. my time step is 0.001, so I need to do run command 3000 time
steps for y & 17000 time steps. How can I apply run command that is started
loading in 2 direction simultaneously, after 3000 time steps loading on y
is stopped and loading on x is continued the remaining 14000 time steps?
obviously you can use two run commands and change your loading in between.
You can do your loading any which way you want. The important step is to break down the total process into parts and do a run for each part, then change the settings and do the run for the next part.